Fabrication and assembly turnaround alone can be one to several weeks depending on board complexity and where it's built. A mistake that forces a second spin doesn't just cost the reorder — it costs that entire cycle again, usually right when a team is under the most schedule pressure to start firmware bring-up. The checks below are the ones that most often get missed on a first board.

Power architecture

Signal integrity and layout

Component and footprint verification

Manufacturability (DFM) review

Before the order goes in

A design-rule check (DRC) passing clean is necessary but not sufficient — DRC catches electrical and spacing violations, not architectural mistakes like a missing decoupling cap or a misrouted antenna feed. A manual review pass against a checklist like this one, ideally by someone who didn't do the original layout, catches a different class of error than automated tools do.

How we approach this

We run a structured DFM and layout review before any board goes to fab, treating the checklist as a floor, not a substitute for engineering judgment on the specific design. See our embedded hardware work for how this fits into schematic capture through bring-up.